Solar energy is one of the most abundant forms of renewable energy, and with the installation of a solar panel system you can save more money on your electricity bills as well as contribute your share in saving the environment. Before deciding on which solar energy system to use, you need to understand more about its characteristics. If you wish to use solar energy, it is important that the system you get must be able to generate at least enough electricity for your requirements. So choosing the right size of the solar panel is critical. A small-sized panel which does not generate enough electricity or too much may not be ideal for your needs. Look at https://sunnyenergysolar.com/ for details about buying the most trusted solar installation services provider. There are generally five steps to a solar panel installation with your selected solar power company will typically follow: engineering site investigation, permitting process, purchasing materials, interconnecting parts, and system integration. The homeowners, however, have more choices and options when it comes to the solar power system installation process. In this article, we will look into the homeowners' options regarding the permitting process and interconnecting parts. First off, homeowners should be aware that there are three main options in connection to the grid. First, a utility-installed system can provide you with electricity, which is called solar power. Second, you can obtain a stand-alone unit that can either be connected to the existing electrical grid or stand alone. Thirdly, some states and cities have implemented tax abatement programs that allow the exemption of up to 100% of the homeowners' past-due electric bills. This may also apply to the interconnection process. When it comes to the second option of a stand-alone unit, it is not necessary to apply for state or local solar panel installation permits. Instead, the installer can procure the required permits on their own. In fact, many states now encourage the installation of a solar panel system by eliminating the need for a permit. For additional information about Solar Panel Installation experts, see here.. Next, when it comes to interconnecting solar panel installations with the electrical grid, most states have implemented what is called "go live" systems. Basically, once a home has been approved for go live status, the homeowner is required to go live. They do this by disconnecting their electric equipment from the existing electrical grid. When they come back, they hook their equipment up to the new grid and automatically, the electric company reconnects the appliances to the new grid. Lastly, when it comes to connecting the electrical wiring between the electric panels and the house, most states and localities require an electrician to work in conjunction with a licensed electrician. This is due to the fact that certain areas of the country have discovered the occurrence of blackouts caused by ground leaks that can run the electrical wiring short in such areas. As you can see, there are numerous permitting processes associated with solar panel installation process. However, if you have a good contractor, they should be able to work the permitting process for you so that you do not need to worry about all of the hassle associated with this type of project. Find out more info about this topic here: https://simple.wikipedia.org/wiki/Solar_panel.
0 Comments
Leave a Reply. |